Apply siding to wall assembly directly to wood structural panel sheathing.
Bottom nailling strip for wood siding shingles.
For all owens corning shingles roofing nails should penetrate into the wood deck by a minimum of inch or completely through the roof deck by a minimum of 1 8 inch.
If the shingle already has flashing on it the kickout flashing has to slip beneath it and you ll have to loosen or remove siding to do this.
Click to enlarge any image this article series discussion includes wood shingle siding underlayment requirements.
The indentations profile cut outs of the bottom edge of the first course of siding must overlap.
Adapted paraphrased with permission from best practices guide to residential construction.
But i used cedar strips for strapping and screws to install the shingles.
Stop the siding where you wish the shingles to start.
From the bottom edge of the starter strip.
Patented surenail technology features a wide highly visible engineered fabric strip in the nailing area for a consistent quality installation and the unique product design provides.
Thick and installed to hang below shim approximately 1 in.
When nailing shingles proper penetration into the roof deck is essential to ensure the nail and shingle remain secure.
Siding nail face nailing face nailing is applicable where dictated by building code in high wind areas and when fastening is to osb or equivalent sheathing without penetrating into studs.
Sheathed wall starter strip starts shingles at the proper angle.
Attach shingles to the strapping one row at a time jogging the placement so one is higher and the next lower etc.
Install the kickout flashing underneath the first shingle photo 1.
Add felt if needed before nailing the new wood on and prime the new wood on all four sides before installing it.
Install horizontal wood cedar strapping to the shed frame with screws higher up the shingle.
If desired the starter strip can be cut from the top of the siding and the bottom portion used for the top course.
Starter strip should be 4 5 in.
Begin by nailing a starter strip approximately 3 8 inch thick x 1 1 2 inch wide flush with bottom edge of sill plate.
4 position the top of the starter course along the chalk line use a straight edge on bottom of shingles if uniform straight edge is desired 5 the first course of shingle siding is then installed even with bottom edge of the starter course.
The difference between a good shingle and a great shingle is having surenail technology only available from owens corning on duration series shingles.
For white cedar shingles maibec recommends a 5 inch exposure but that figure can vary up to 1 4 inch to make a layout work in the space you have measure from the underside of the soffit or the frieze board to the bottom of the sheathing and add the overhang see starter course below.
Wood shingle siding nailing details.